H1 has a number of alignment changes pre-5.8M to post-5.8M Montana earthquake.
IMC optic alignment changes are listed here, in urad and beam position change in mm:
delta urad | delta mm | |
mc1 p | 2.3 | 0.1 |
mc1 y | 29.1 | 1.3 |
mc2 p | 9.7 | |
mc2 y | -13.2 | |
mc3 p | 34.6 | 1.6 |
mc3 y | 19.5 | 0.9 |
IM changes worth noting:
delta urad | |
im1 y | 39.5 |
im2 p | 11.4 |
im2 y | 46.7 |
other optics/qpds worth noting:
delta | |
imc wfs a p (reflects IMC optic alignment / PSL beam) | -0.129 wfs qpd |
imc wfs b p (reflects IMC optic alignment / PSL beam) | -0.203 wfs qpd |
imc wfs b y (reflects IMC optic alignment / PSL beam) | 0.051 wfs qpd |
iss 2nd loop y (reflects IMC beam and IM alignment) | -0.131 qpd |
pr2 p (reflects IMC beam and IM alignment) | -20.0 urad |
pr2 y (reflects IMC beam and IM alignment) | 22.6 urad |