TITLE: 07/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Travis
SHIFT SUMMARY:
Most if the day spent trying o damp violin modes. Some successful, some not. Elevated noise in DARM between 20-80Hz has reduced the range back into the 50Mpc area. Handing off to Travis.
LOG: