H1 SUS
betsy.weaver@LIGO.ORG - posted 16:25, Monday 06 August 2012 (3740)
H1 MC2 installed in HAM3

(Betsy, Travis, Deepak, Cheryl, Dale on the camera)

All the prep work paid off and the MC2 was installed into the chamber relatively easy this afternoon.  Using the genie, we hoisted it up to the elevator which was attached to the arm, attached the spacer to the bottom of the suspesnion, and then used the arm to swing it into place on the ISI table against the cookie cutter.  We added a few dog clamps to make sure it doesn't walk away overnight.  Tomorrow we continue adding dog clamps, hooking up cables, etc.