TITLE: 07/11 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Earthquake
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
Wind: 8mph Gusts, 6mph 5min avg
Primary useism: 1.74 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY: When I got here Patrick was battling some PI's while sitting at INCREASE_POWER. DCPD saturations were continuous and DARM looked bad. With neither of us finding the problem, seismon reported an incoming earthquake that just broke the lock.