After this morning's work in the PSL, I completed the weekly FAMIS tasks.
HPO Pump Diode Current Adjust (FAMIS 8430)
No adjustment was made as I could not get the laser power to increase. I also attempted to adjust the operating temperatures of the DBs, and that also did not increase the laser output power. Therefore the operating temperatures and currents of the HPO DBs remains unchanged from last week. A screenshot of the PSL Beckhoff main screen is attached for future reference. This completes FAMIS 8430.
PSL Power Watchdog Reset (FAMIS 3658)
The power watchdogs were reset during this morning's PSL work. This completes FAMIS 3658.