I was only able to test ~20 joints today on the Vertex due to leaks. Aaaargh! At this rate, I'll need two or more additional days to finish! A few of the leaks were on "legacy" joints circa 1998 but most were on new aLIGO joints. I was able to retorque and get most of these to seal but this wastes time and is "not on the schedule" - better to do it right the first time!