Reports until 22:59, Wednesday 24 November 2010
H2 INS
michael.landry@LIGO.ORG - posted 22:59, Wednesday 24 November 2010 (375)
HAM8, HAM9 optics tables cleared
(Dani, Keita, Matt, Gerardo, Zack, Mike)

We removed all components from the optics tables in HAMs 8 and 9.  We locked down MC2, MMT2 and the RM before extraction.  The AOS PO telescope in HAM9 was pulled with the aid of the surf board/forklift combination, lifting the unit out and transferring it from board to table, once out of chamber. Other components removed include black glass dumps, wire-protection baffles, posts, DLC mount and mirrors, and sundry clamps and hardware.  Currently the SOSs are in the OSB optics lab, while the RM and AOS telescope remain in the LVEA.

Next week we'll pull optics tables and passive stacks in those HAMs.