TITLE: 07/17 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 0Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: recovery from 5.8M EQ continues, with some interesting results
LOG:
- shift was focused on alignment and then locking
- Sheila aligned
- I measured beam spots on the IMC
- locking went well, however the fast shutter issues prevented full lock at high power
- I was able to open and close the shutter and recreate the issue (appears to be part way closed)
- H1 currently locked in DRMI, and guardian is set for Down
- rebooted nuc5 after the seismic plot crashed (by disappearing)
Cheryl got in contact with Jeff B. regarding a canceled Owl shift tonight. Sheila contacted Keita & myself regarding this.