TITLE: 07/18 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Jim
CURRENT ENVIRONMENT:
Wind: 10mph Gusts, 7mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.06 μm/s
All is quiet *knock on wood!*
QUICK SUMMARY:
Arrived to Sheila doing beam spot work. H1 then dropped out & was restored fairly quickly to NLN. Thomas is currently out on floor measuring CARM Gain & then Jeff K. will perform calibration measurement. Will aim for OBSERVING after this work.
Just had a visit from Harrah Elementary School led by Elizabeth.