Displaying report 1-1 of 1.
Reports until 08:04, Wednesday 19 July 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:04, Wednesday 19 July 2017 (37607)
Ops Owl Shift Summary
Ops Shift Log: 07/19/2017, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Locked at NLN with 29.0 watts and 54.8Mpc of range.
Intent Bit: Observing
Support: N/A
Incoming Operator: Ed
Shift Summary: Good observing shift although range could be better. A2L is elevated in both Pitch and Yaw. LLO has been up all morning so there has been no opportunity to run the repair script. Other than a couple of small earthquakes (one in South Pacific and one in South Atlantic) which did not perturb the IFO, there were no operational issues or problems during the shift.
 
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from Corey
15:00 (08:00) Turn over to Ed
Displaying report 1-1 of 1.