15:00 Bubba to MX to survey upcoming Apollo welding work.
15:31 big LF glitch
15:33 Marc to MY
15:34 another LF glitch
15:51 Marc and Bubba back
16:44 Chris will move the 1 ton from behind the water tower to the LSB.
16:57 big LF glitch
18:32 Cheryl into optics lab
18:45 Chandra to MY
18:59 Karen to MY to clean
19:07 Found INJ_Trans node in "INIT" state so I returned it to the INJECT_SUCCESS state.
19:17 another LF glitch
19:19 coordinating with those that have file mods to commit them to SVN