HAM5ISI Installation
The main activity of the day was the installation of the HAM5-ISI. Hugh & crew started rolling this assembly into HAM5 at 10:30 & they were mainly done before lunch. They were completely done by 2pm-ish.
Other Activities
-
All BSC8/BSC6 SEI Watchdogs tripped last night due to Russian earthquake
-
Fire Dept on-site
-
Dave addressed watchdog issue with the HAM3 optics (this was to allow Betsy to run measurements remotely)
-
TCS CO2 Laser powered up in East Bay
-
EX Dust Monitor went INVALID (notified Patrick)
-
Thomas re-aligned the EY Optical Lever "x 2" (FYI, a lizard now calls EY VEA home)
-
HAM2 ISI positioning work (Hugh, Jim)
For the afternoon, Vincent requested quiet time so he could run SEI measurements.
Maitenance:
-
CP8 filled
-
Unifirst & King Soft Water on-site