Reports until 16:17, Thursday 09 August 2012
LHO VE
kyle.ryan@LIGO.ORG - posted 16:17, Thursday 09 August 2012 (3782)
Septum separating HAM5-HAM6 passes final annulus leak test
The HAM5 and HAM6 annulus ion pumps demonstrated their ability to maintain the annulus pressure (unassisted by aux. carts) for greater than 2 days with ion current values of 5 LEDs and 6 LEDs respectively.  This was done while the Vertex was under vacuum.  Additionally, no pressure communication was observed on the Vertex MTP CC gauge (@ 3 x 10-7 torr) when the HAM5-HAM6 annulus volume was vented.