Reports until 08:24, Saturday 29 July 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:24, Saturday 29 July 2017 (37868)
Ops Day Shift Transition
Ops Shift Transition: 07/29/2017, Day Shift 15:00 –23:00 (08:00 - 16:00) - UTC (PT)
State of H1: Locked at NLN, power at 28.7w, range at 55.6Mpc
Intent Bit: Observing
Weather: Skies are clear, winds are calm, Temps are in the low 70s, afternoon high 90s to low 100s  
Primary 0.03 – 0.1Hz: 0.007um/s
Secondary 0.1 – 0.3Hz: 0.02um/s
Quick Summary: IFO in observing for past 11 hours. Been in triple observing for past 2.5 hours. The 1000Hz plus Violin modes are a bit riled up. Given all the observatories are on line and we are not doing that badly, will monitor for now. A2L is slightly elevated in YAW, but not enough to cause concerns.  
Outgoing Operator: Corey