Displaying report 1-1 of 1.
Reports until 00:11, Sunday 30 July 2017
LHO General
patrick.thomas@LIGO.ORG - posted 00:11, Sunday 30 July 2017 (37881)
Ops Eve Shift Summary
TITLE: 07/29 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 53Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY:

Spent about 2.5 hours damping violin modes at NLN before losing lock and having the fundamentals ring back up again. I decided it might be best to go directly to observing after getting back to NLN despite the violin modes.

LOG:

23:37 UTC Rick, Peter and Jian in staging building working on PMC
23:42 UTC Lock loss
Guardian lost connection to a channel in the middle of DRMI_ASC_OFFLOAD. Hit stop and then exec. PRC1, SRC1 and SRC2 Yaw started diverging. Sheila recovered them.
00:36 UTC NLN
00:38 UTC Rick, Peter and Jian leaving
03:07 UTC Lock loss (was sitting at NLN damping violin modes)
03:34 UTC Stuck at ENGAGE_SOFT_LOOPS. Soft loops not converging? OMC also not locking on the right mode.
03:35 UTC Requested ENGAGE_SOFT_LOOPS. Lock loss.
04:02 UTC NLN. Fundamental violin modes rung back up. Setting to observing.
04:18 UTC PI mode 27 rang up and damped on its own.
Displaying report 1-1 of 1.