Reports until 10:00, Tuesday 01 August 2017
H1 PSL
jason.oberling@LIGO.ORG - posted 10:00, Tuesday 01 August 2017 (37936)
PSL Weekly FAMIS Tasks (FAMIS 3661 & 8433)

This morning I completed the weekly PSL FAMIS tasks.

HPO Pump Diode Current Adjust (FAMIS 8433)

With the ISS OFF, I adjusted the pump diode currents for the HPO.  All currents were raised by 0.2 A, changes are summarized in the table below.  I have also attached a screenshot of the PSL Beckhoff main screen for future reference.

  Operating Current (A)
Old New
DB1 49.1 49.3
DB2 52.1 52.3
DB3 52.1 52.3
DB4 52.1 52.3

I did not adjust the DB operating temps.  The ISS is now back ON, and the HPO is outputting ~154.9 W.  This completes FAMIS 8433.

PSL Power Watchdog Reset (FAMIS 3661)

I reset both PSL power watchdogs at 16:51 UTC (9:51 PDT).  This completes FAMIS 3661.

Images attached to this report