Displaying report 1-1 of 1.
Reports until 16:02, Tuesday 01 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:02, Tuesday 01 August 2017 (37950)
Ops Day Shift Summary
Ops Shift Log: 08/01/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, 28.6w, 53.4Mpc
Intent Bit: Observing
Support: Jenne, Dave B.   
Incoming Operator: Jim
 
Shift Summary: After maintenance ran initial alignment. Relocked with little difficulty. Violin modes Mod-3 and Mod-4 were slightly elevated, so small damp to Mod-3. After clearing SDF Diffs back into Observing. Damp PI Mode-20, PI Mode-27, and PI Mode-28. A2L looks OK.
Ran SVN file checks – Commit updates to repository.
Drop out of Observing so Sudarshan could cover End-X viewports (WP #7099)
Back into Observing after Sudarshan is out of End-X 

 

Activity Log: Time - UTC (PT)
14:54 (07:54) Ace on site to service Porta-Potty
14:57 (07:57) Richard & Ken – Going to End-Y
15:00 (08:00) Take over from Cheryl
15:00 (08:00) Jeff K. – Take down IFO
15:02 (08:02) HDF on site for testing
15:05 (08:05) Jeff K. – Running rubbing and charge measurements
15:31 (08:31) Switch to VERY_WINDY_NOBRSXY
15:40 (08:40) Filiberto – Going into LVEA for Squeezer work
15:46 (08:46) Gerardo – Going to End-X to label gate valves
15:57 (08:57) Apollo – Going to Mid-X to check temp sensor
15:58 (08:58) Norco – On site to deliver to CP-5
16:00 (09:00) Richard & Ken – Back from End-Y
16:00 (09:00) HFD – Working at End-Y
16:13 (09:13) Ken – Going into the LVEA
16:21 (09:21) Karen – Finished at End-Y
16:24 (09:24) Filiberto – Out of the LVEA
16:25 (09:25) Liz – Going to End-X
16:29 (09:29) Ken – Out of LVEA – Going to End-Y
16:34 (09:34) GRB Alert – In maintenance
16:45 (09:45) Jason – Adjust PSL Diode current
17:00 (10:00) Norco – On site delivery to CP-2
17:04 (10:04) Ken – Back from End-Y – Going into the LVEA
17:04 (10:04) GRB Alert – In maintenance
17:10 (10:10) Kyle – Finished at End-X
17:20 (10:20) Mike – Tour group into LVEA
17:43 (10:43) HFD – Finished at End-Y – leaving site
17:59 (10:59) Ken – Out of the LVEA
18:09 (11:09) Kyle – Going into LVEA to make some measurements near HAM7
18:24 (11:24) Vender on site to swap out mats
18:43 (11:43) Kyle – Out of the LVEA
18:50 (11:50) Kyle – Going to End-X to drop off parts
18:59 (11:59) Ed – Sweep the LVEA
19:07 (12:07) Kyle – Back from End-X
19:32 (12:32) King Soft – Check RO pump
19:33 (12:33) Filiberto – Going to Mid-Y to look for parts
20:53 (13:53) Relocked at NLN
21:10 (14:10) Cleared SDF Diffs and back into Observing
21:16 (14:16) Damp PI Mode-28
21:22 (14:22) Damp PI Mode-20
21:23 (14:23) Damp PI Mode-27
22:20 (15:20) Run SVN file checks and commit updates to repository
22:32 (15:32) Sudarshan – Going to End-X to put back viewport cover – WP #7099
22:50 (15:50) Sudarshan – Finished at End-X – Back to Observing
23:00 (16:00) Turn over to Jim
 
 
 

 

Displaying report 1-1 of 1.