Displaying report 1-1 of 1.
Reports until 16:00, Wednesday 02 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Wednesday 02 August 2017 (37970)
Ops Day Shift Summary
Ops Shift Log: 08/02/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked – recovery from lockloss and SUS reboot
Intent Bit: Commissioning
Support: Dave, Filiberto, Richard, Sheila
Incoming Operator: Jim
 
Shift Summary: GRB Alert – All sites good – One-hour stand down.  A2L is elevated in YAW, and in Pitch around 9Hz. Will run the repair script at the first opportunity.
Robert – Running PEM injections from 16:30 (09:25) to 19:00 (13:00)
After commissioning lockloss rebooted the SUS electronics (WP #7101)
After reboot finished ran Initial Alignment and start relocking
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Cheryl
15:21 (08:21) GRB Alert – All sites observing
16:25 (08:25) Drop intent bit to Commissioning
16:25 (09:25) Robert – Going into LVEA to run PEM injections
16:25 (09:25) Run A2L repair script
18:17 (11:17) Lockloss – Commissioning
18:23 (11:23) Filiberto – Going to Mid-Y to look for parts
18:53 (11:53) Filiberto – Back from Mid-Y
19:18 (12:18) Relocked at NLN – Back to commissioning
19:27 (12:27) Damp PI Mode-28
19:30 (12:30) Damp PI Mode-27
20:20 (13:20) Robert – Finished with PEM injections
20:30 (13:30) Sheila – Commissioning
20:40 (13:40) Lockloss – Commissioning
20:45(13:45) SUS Electronics reboot – WP #7101
22:14 (15:14) Run Initial Alignment
23:00 (16:00) Turn over to Jim
Displaying report 1-1 of 1.