Reports until 16:03, Thursday 03 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:03, Thursday 03 August 2017 (37985)
Ops Day Shift Summary
Ops Shift Log: 08/02/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN; Power is 28.7w; Range is 54.2Mpc
Intent Bit: Observing
Support: Sheila
Incoming Operator: Jim
 
Shift Summary: A2L check script shows PITCH is OK, YAW is rung up around 12Hz.  
In Commissioning mode – Robert doing PEM injections
Sheila – commissioning work on EDS transitions
After relock back into Observing
A2L PITCH is OK. YAW is rung up between 10 and 16Hz to 0.8. Need to run the repair script at the next opportunity
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Cheryl
16:42 (09:42) Drop to Commissioning – Robert doing PEM injections
17:30 (10:30) GRB Alert – All site doing commissioning work
20:37 (13:37) Lockloss – Commissioning
21:05 (14:05) Relocked at NLN – Commissioning work continues
21:07 (14:07) Damp PI Mode-28
21:08 (14:08) Damp PI Mode-27
21:09 (14:09) Damp PI Mode-26
21:36 (14:36) Sheila – Going to End-X
21:37 (14:37) Damp PI Mode-26
21:49 (14:49) Lockloss – Commissioning
22:30 (15:30) Relocked at NLN
22:33 (15:33) Back in Observing
22:37 (15:37) Damp PI Mode-28
22:41 (15:41) Damp PI Mode-26
23:00 Turn over to Jim