Reports until 16:11, Sunday 06 August 2017
H1 General
edmond.merilh@LIGO.ORG - posted 16:11, Sunday 06 August 2017 - last comment - 16:29, Sunday 06 August 2017(38034)
Shift Transition - Eve

TITLE: 08/06 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Aligning
OUTGOING OPERATOR: Travis
CURRENT ENVIRONMENT:
    Wind: 6mph Gusts, 4mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.06 μm/s
QUICK SUMMARY:

Arrived to find a2l needing to be run and Livingston was down, so I did. Dr Kissel is here measuring and plotting. Travis had nothing to report. Looks like business as usual.

 

Comments related to this report
edmond.merilh@LIGO.ORG - 16:29, Sunday 06 August 2017 (38035)

23:28 H1 back to Observing