Reports until 07:59, Tuesday 08 August 2017
LHO General
patrick.thomas@LIGO.ORG - posted 07:59, Tuesday 08 August 2017 - last comment - 08:04, Tuesday 08 August 2017(38067)
Ops Owl Shift Summary
TITLE: 08/08 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Jeff (covering for Travis)
SHIFT SUMMARY:

Remained in observing until a 6.5 mag earthquake in China knocked us out of lock. Left ISC_LOCK at DOWN and started maintenance early. ISI_CONFIG is set to LARGE_EQ_NOBRSXY.

Issues (see earlier alogs):
GraceDB query failure
Possible mismatch on ops overview for ETMY RMS WD, current overview on video2 not the same as one currently linked on sitemap?
ALS X fiber polarization
Seismon not updating
Tripped watchdogs from earthquake

LOG:

12:32 UTC restarted video4
14:05 UTC Lockloss, 6.5 mag earthquake in China
14:17 UTC Chris to CER to work on scaffolding
14:32 UTC Karen opening receiving door
14:46 UTC Bubba to CER to work with Chris on scaffolding
Comments related to this report
patrick.thomas@LIGO.ORG - 08:04, Tuesday 08 August 2017 (38069)
~15:02 UTC Karen driving car to OSB receiving