Reports until 11:37, Friday 10 August 2012
H2 AOS
thomas.vo@LIGO.ORG - posted 11:37, Friday 10 August 2012 (3807)
H2 ITMY/ETMY Optical Levers Re-Alignment
The H2 ITMY and ETMY have been re-centered with the cavity beam locked at approximately 10:05 for ITMY and 10:55 for ETMY.  The cavity was locked at the time.

One particular note, all of the electronics for the ETMY optical levers (laser, whitening chassis, power supply) were running off a power strip that was disconnected sometime in the past few days and this caused a loss in signal.  Please don't do this.