Today I connected the TMDS Gas Delivery Table to the 100 psi tap of the X-end vent/purge air supply and let the dry air flow through the table's plumbing. The ionizer assembly, scroll pump, 6' of 1" SS tube and 3' of 3/8" copper tubing which would nominally be connected during an actual discharge exercise were not connected. As such, the air exhausted into the room instead. I had to make a few minor "tweeks" and fix a few leaks. The observed flow rate (rotameter) was ~50-60 lpm for ~20-25 psi regulator output. This is consistent with the flow vs. pressure relationship observed by LLO (see Harry, Ryan, Scott notes "TMDS_ETMX_2-3-16.pdf" from LLO log entry?) I shut down the vent/purge compressors and removed the TMDS table from the VEA (brought it back to the Corner Station Mechanical Room). I will now remove the table's various plumbing components and have them cleaned. NOTES TO SELF: Compressor #4 needs a replacement pressure relief valve. The 1" MNPT to 1" tube adapter at the VEA point-of-use valve is still leaking. Need to adapt one of the various iLIGO aluminum billet "door stops" to serve as a pipe support for the 1" line that will route beneath the ISC table. The dedicated TMDS scroll pump has a factory label stating that it is configured for "US 120VAC" but, in fact, it is still configured internally for 220VAC - need to correct this before using. Also, need to integrate the AC drop-out mechanism and NEMA 20 twist lock connectors to the scroll pump power cord. Need to modify terminal cover and add 120VAC wiring for spring-close isolation solenoid valve.