Ops Shift Transition: 08/09/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: Locked at NLN, 29.2w of power, and a range of 54.7Mpc
Intent Bit: Observing
Weather: Light winds and thick smoke haze blanketing the area, temperatures currently in the mid-70s.
Primary 0.03 – 0.1Hz: At 0.01um/s
Secondary 0.1 – 0.3Hz: At 0.03um/s
Quick Summary: IFO locked for 9 hours and in triple coincident Observing for past 6 hours. No problem or issues to report at this time. Will be doing PEM Injection commissioning from 16:00 (09:00) until 20:00 (13:00) today.
Outgoing Operator: Patrick