Ops Shift Log: 08/09/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, range of 52.6Mpc from 28.7w of power
Intent Bit: Observing
Support: Sheila, Dave B.,
Incoming Operator: Jim
Shift Summary: 16:00 (09:00) – Start PEM Injection commissioning. Ran A2L script – Both Pitch and Yaw are below the reference.
TJ did a sweep of the LVEA
Fire Alarm in LSB – Building evacuated, Bubba informed and responding, HFD on site with units. Determined to be a false alarm.
Relocked after commissioning Lockloss. Damped a couple of PI modes. A2L Yaw is rung up; Pitch is OK. Ran repair script. A2L Pitch and Yaw look OK.
Back to Observing.
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Patrick
16:02 (09:00) Switch to Commissioning for PEM Injections
16:10 (09:10) Bubba – Going to Mid-X
16:11 (09:11) John – Tanking contractor to Mid-Y
16:15 (09:15) TJ – Did sweep of LVEA. Unplugged 1 unused extension cord
16:55 (09:55) Robert – Going to End-X
17:05 (10:05) Bubba – Back from Mid-X
17:35 (10:35) Marc – Going to Mid-Y to drop off parts
18:45 (11:45) Fred R. - Called to report a LSB fire alarm. Informed Bubba – Suspect a false alarm
19:00 (12:00) HFD on site with several fire trucks responding to LSB fire alarm
19:09 (12:09) Robert – Back from End-X
19:11 (12:11) Robert – Going into the LVEA
20:09 (13:09) Robert – Finished with PEM Injections – Sweeping the LVEA
20:10 (13:10) Sheila – Commissioning work
20:18 (13:18) Sheila – At End-X to remove shielding box
20:19 (13:19) Bubba & John – Going to Mid-Y to build scaffolding
20:27 (13:27) Lockloss – Commissioning
21:40 (14:40) Relocked at NLN
21:42 (14:42) Damp PI Mode-27
21:52 (14:52) Damp PI Mode-28
22:02 (14:02) Run A2L repair script
22:04 (15:04) Damp PI Mode-27
22:30 (15:30) Bubba – Back from Mid-Y
23:00 (16:00) Turn over to Jim