Displaying report 1-1 of 1.
Reports until 08:00, Thursday 10 August 2017
LHO General
patrick.thomas@LIGO.ORG - posted 08:00, Thursday 10 August 2017 (38116)
Ops Owl Shift Summary
TITLE: 08/10 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 52Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Remained in observing the entire shift. No issues to report.
LOG:

08:30 UTC - 08:47 UTC Walked through LSB (fire check).
10:30 UTC - 10:47 UTC Walked through LSB (fire check).
12:12 UTC - sometime before 12:53 UTC Chris moving GSA vehicles from OSB parking lot to near carpenter shop (from camera).
14:54 UTC Seal Coat Solutions through gate to work on parking lot.
Displaying report 1-1 of 1.