Displaying report 1-1 of 1.
Reports until 16:01, Thursday 10 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:01, Thursday 10 August 2017 (38127)
Ops Day Shift Summary
Ops Shift Log: 08/10/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, 28.6w, and 51.2Mpc
Intent Bit: Commissioning
Support: Sheila,
Incoming Operator: Jim
Shift Summary: Into commissioning mode for Robert and Sheila. Relocking after commissioning lockloss. Damped Violin Mode-4 and several PI Modes. Back to NLN and turn back over to Sheila.  

 

Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Patrick
16:46 (09:46) Drop into Commissioning mode for Robert’s PEM Injections
16:50 (09:50) Robert – Going into the LVEA
17:28 (10:28) Karen – Going into the Optics lab
17:56 (10:56) Karen – Out of Optics Lab
17:56 (10:56) Karen – Going to End-Y after picking up vacuum from the CS receiving
18:05 (11:05) Sheila and TVo – Going into LVEA to run cable
18:18 (11:18) Sheila & TVo – Out of the LVEA
19:33 (12:33) Karen – Finished at End-Y – coming back to CS
19:34 (12:34) Robert – Out of the LVEA
21:00 (14:00) Robert finishing – turning over to Sheila
21:27 (14:27) Lockloss – Commissioning
21:30 (14:30) Jeff K – Going to End-Y to power cycle UIM Chassis
22:18 (15:18) Damp Violin Mode-4 (505.817)
22:34 (15:34) Damp PI Mode-28
22:36 (15:36) Damp PI Mode-27
22:45 (15:45) Damp PI Mode-26
22:51 (15:51) Damp PI Mode-26
22:51 (15:51) Relocked at NLN
22:52 (15:52) Damp PI Mode-27

23:00 (16:00) Turn over to Jim

 

Displaying report 1-1 of 1.