Displaying report 1-1 of 1.
Reports until 08:28, Friday 11 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:28, Friday 11 August 2017 (38139)
Ops Day Shift Transition
Ops Shift Transition: 08/11/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: Locked at NLN, 28.6w, and 52.2Mpc   
Intent Bit: Commissioning
Weather: Winds are calm, allowing the fire smoke/haze to continue through the weekend. Temperatures are hot with highs expected to be the low 100s.  
Primary 0.03 – 0.1Hz: At 0.006um/s
Secondary 0.1 – 0.3Hz: Z Axis at 0.04um/s, X and Y Axis are below the scale of the plot
Quick Summary: IFO has been locked for the past 16 hours. All green and clear at this time. Dropped into Commissioning for PEM injections.
Outgoing Operator: Ed
Displaying report 1-1 of 1.