Reports until 15:59, Friday 11 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:59, Friday 11 August 2017 (38146)
Ops Day Shift Summary
Ops Shift Log: 08/11/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, 29.2w, 52.5Mpc
Intent Bit: Observing
Support: N/A
Incoming Operator: Jim
 
Shift Summary: Turn IFO over to commissioning at start of shift. Commissioning lockloss. Difficulty relocking. Needed to tweak the alignment in several places. Damped ETMX Violin modes 1, 3, and 4 before fully relocking.
Back to Observing after clearing SDF Diffs.   
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Ed
15:12 (08:12) Dropped into Commissioning for PEM Injection work
15:55 (08:55) Richard – Going into the LVEA
15:56 (08:56) Robert – Going into the LVEA
16:41 (09:41) Platt Electric on site delivering EE supplies
17:07 (10:07) Parking Lot Solutions – On site to resurface parking areas
17:24 (10:24) Lockloss – Commissioning
18:58 (11:58) Robert swept the LVEA
20:34 (13:34) Relocked at NLN – Back to commissioning
20:45 (13:45) Robert – Going back into the LVEA
20:56 (13:56) Damp PI Mode-27
22:00 (15:00) Kentaro – Taking visitor to End-X
22:11 (15:11) Back to Observing
22:19 (15:19) Kentaro – Back from End-X
23:00 (16:00) Turn over to Jim