TITLE: 08/13 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 50Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Problems with sus power supplies and noisy earth. And fires.
LOG:
When I arrived Patrick was still trying to diagnose a tripped ETMX sus. Jeff has a alog on that.
4:00 RIchard on site to replace ETMX power supplies. I put in alog about that. Around the same time an Indonesian earthquake arrives.
6:58 Finally back to observing.