Reports until 00:07, Sunday 13 August 2017
H1 General
jim.warner@LIGO.ORG - posted 00:07, Sunday 13 August 2017 (38166)
Shift Summary

TITLE: 08/13 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 50Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Problems with sus power supplies and noisy earth. And fires.
LOG:

When I arrived Patrick was still trying to diagnose a tripped ETMX sus. Jeff has a alog on that. 

4:00 RIchard on site to replace ETMX power supplies. I  put in alog about that. Around the same time an Indonesian earthquake arrives.

6:58 Finally back to observing.