[David T, Cheryl V and Deepak K]
-
Most of the parts required for assembling the FI has been hunted down.
-
The Granite Block for the FI is kept on the H1 PSL Table.
-
Almost all the parts that have been located are kept in the H2 PSL Enclosure.
-
The Tools are also stored at the same place.
-
The Hardware for the FI is in the C&B load.
-
The H1 FI Spacer, H1 FR Heat Sink(?) and the H1 RWHP height adapter are also in the Clean and Bake.
-
The Siskiyou mounts are also stored in the H2 PSL enclosure.
-
The alignment optics are also in the H2 PSL Enclosure.
-
A cart with a optical table is also stored in the Enclosure for transporting the Faraday Isolator.
-
An Aluminum Box is being designed to cover the FI during transportation and can be locally made onsite @LHO.