Reports until 16:28, Tuesday 15 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:28, Tuesday 15 August 2017 (38219)
Ops Evening Shift Transition
Ops Shift Transition: 08/15/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: Locked at NLN, power 28.9w, 49.3Mpc 
Intent Bit: Commissioning
Weather: Light scattered clouds gracing clear blue skies. Wind is a Calm to Light breeze. Temperatures in the mid-80s.   
Primary 0.03 – 0.1Hz: X and Y Axis at 0.02um/s, Z Axis at 0.009um/s
Secondary 0.1 – 0.3Hz: At 0.04um/s
Quick Summary: IFO is relocked after maintenance window. Damped PI Modes 27 and 28. Running A2L repair script before going back into observing.
Outgoing Operator: Cheryl