Reports until 15:53, Wednesday 16 August 2017
LHO General
jenne.driggers@LIGO.ORG - posted 15:53, Wednesday 16 August 2017 (38234)
Ops Day Shift Summary

TITLE: 08/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 51Mpc
INCOMING OPERATOR: JeffB
SHIFT SUMMARY:  Quiet shift, with a few hours of calibration measurements in the middle. JeffK was operator for the first hour, then I took over for the rest of the shift.
LOG:

(JeffK) Aug 16 2017 15:15:44 UTC New remote user, ROOT
(JeffK) Aug 16 2017 15:18:13 UTC New remote user, ROOT
(JeffK) Aug 16 2017 15:51:12 UTC GRB Alert
Aug 16 2017 16:00:00 UTC Take over from JeffK
Aug 16 2017 16:10:06 UTC Parking lot crew through gate
Aug 16 2017 17:12:53 UTC Karen opening receiving roll-up door to remove cardboard
Aug 16 2017 17:31:09 UTC Out of Observe for JeffK calibration measurements
Aug 16 2017 18:12:26 UTC JohnW working on chiller fault at EndYAug 16 2017 19:09:33 UTC Bubba and JohnW to EndY chiller yard
Aug 16 2017 19:28:50 UTC Bubba and JohnW to EndY air handler mechanical room
Aug 16 2017 19:46:25 UTC Bubba and JohnW leaving EndY
Aug 16 2017 20:20:04 UTC TJ to optics lab to check on parts
Aug 16 2017 20:45:22 UTC TJ out of optics lab
Aug 16 2017 21:00:45 UTC JohnW to MidY
Aug 16 2017 21:11:28 UTC Measurements finished
Aug 16 2017 21:11:59 UTC Back to Observing
Aug 16 2017 21:19:52 UTC JohnW back
Aug 16 2017 22:50:08 UTC Hand over early to JeffB