Displaying report 1-1 of 1.
Reports until 08:10, Monday 21 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:10, Monday 21 August 2017 (38290)
Ops Day Shift Transition
Ops Shift Transition: 08/21/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: Locked at NL; power is 28.6w; range is 53.5Mpc.
Intent Bit: Observing
Weather: Clear skies with winds Calm to Light breeze, Temperatures forecast for the low 90s.
Primary 0.03 – 0.1Hz: At 0.01um/s – Ringing down from an earlier earthquake
Secondary 0.1 – 0.3Hz: At 0.05um/s
Quick Summary: Locked for past 23.5 hours and in Observing for past 14. LLO is down due to the earthquake. A2L Yaw has a coherence of 6.5. Going to take this opportunity to run the A2L repair script.  
Outgoing Operator: Jim
Displaying report 1-1 of 1.