Displaying report 1-1 of 1.
Reports until 16:05, Monday 21 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:05, Monday 21 August 2017 (38296)
Ops Day Shift Summary
Ops Shift Log: 08/21/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, 28.6w, 51.5Mpc
Intent Bit: Observing
Support: N/A
Incoming Operator: TJ
Shift Summary: Drop out of Observing for 5 minutes to run A2L repair script, while LLO is down. 7 hours of shift was triple-coincident Observing time. No problems noted during the shift.  

 

Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Jim
15:11 (08:11) Drop out of Observing to run A2L repair script
15:16 (08:16) Back into Observing
16:15 (09:15) Solar eclipse has started
17:24 (10:24) 96% of totality – Outside darkened and noticeably cooler. No bird or animal sounds
17:36 (10:36) King Soft – On site to service RO pump in pump room, next to carpenter’s shop
22:15 (15:15) Reboot Video4
23:00 (16:00) Turn over to TJ
Displaying report 1-1 of 1.