H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:01, Wednesday 23 August 2017 (38317)
Ops Evening Shift Summary
Ops Shift Log: 08/22/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Locked at NLN, 29.2w, 50.4Mpc  
Intent Bit: Observing
Support: Sheila, Corey
Incoming Operator: Ed
 
Shift Summary: Relock after maintenance and commissioning work. Corey did mini sweep (turned off lights in LVEA and checked the WAP was unplugged. After clearing a few SFD differences back into Observing mode.
Ran A2L script – Yaw is elevated to 0.9 coherence. Have not run repair script due to triple-coincident Observing.
No significant issues or occurrences during the shift.  
 
Activity Log: Time - UTC (PT)
23:00 (16:00) Take over from Corey
23:15 (16:15) Corey – Mini sweep (lights and WAP) of LVEA
23:22 (16:22) Locked at NLN – Turn over to commissioners
23:33 (16:33) Lockloss – Commissioning
00:19 (17:19) Locked at NLN
00:35 (17:35) Cleared SDF differences and back to Observing
00:36 (17:36) Damp PI Mode-28
00:46 (17:46) Damp PI Mode-27
01:45 (18:45) Turn off extra lights and secure the OSB doors
06:10 (23:10) Run A2L – Yaw elevated to 0.9 coherence  
07:00 (00:00) Turn over to Ed
Displaying report 1-1 of 1.