Reports until 16:10, Thursday 24 August 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:10, Thursday 24 August 2017 (38353)
Ops Evening Shift Transition
Ops Shift Transition: 08/24/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: Locked at NLN, 28.6w, 51.1Mpc
Intent Bit: Observing
Weather: Clear skies; Winds 10 to 18mph, Temps in the mid-80s
Primary 0.03 – 0.1Hz: X & Y Axis at 0.2um/s, Z Axis at 0.02um/s
Secondary 0.1 – 0.3Hz: At 0.1um/s
Quick Summary: IFO Locked and Observing along with LLO and Virgo. A2L looks good. No problems or issues to report.
Outgoing Operator: Patrick