Ops Shift Log: 08/24/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Relocking
Intent Bit: Commissioning/Locking
Support: Sheila, Jenne, Jeff K.,
Incoming Operator: Ed
Shift Summary: After second lockloss and could not relock ran an initial alignment. Had a bit of trouble with the MITCH_DARK stage, but after several tries and an assist from Sheila, completed the initial alignment. Tried relocking. Cannot make it past CHECK_IR. Wind is up, with gusts well into the upper 30mph range. X and Y microseism is up to 0.3um/s. BRS-X RY_INMON is off the charts right now. The winds are forecast to abate around 22:00PT. Going to hold in DOWN until things quiet down before trying to relock.
Getting high dust counts at End-Y. Caused by high winds and heavy forest fire smoke.
Environmental conditions are improving, so will try relocking.
Relocking no go. Rerun initial alignment. Twice initial alignment stuck at SCR_ALIGN LOCKING_SRY; and twice it tripped the SRM WD.
On third try made it through initial alignment. Trying to relock.
Slowly working through the relocking steps. Turn over to Ed; perhaps he will have better results.
Activity Log: Time - UTC (PT)
23:00 (16:00) Take over from Patrick
23:10 (16:10) Lockloss – Unknown
23:16 (16:16) HFD - Going to Mid-X to check the alarm panel
23:35 (16:35) Relocked at NLN – Back into Observing
23:36 (16:36) Damp PI Mode-28
23:37 (16:37) Damp PI Mode-27, 19
00:38 (17:38) Lockloss - Unknown
01:40 (18:40) Complete Initial Alignment
01:41 (18:41) Try relocking
02:35 (19:35) Put IFO into DOWN until environmental conditions improve
07:00 (00:00) Turn over to Ed