TITLE: 08/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Commissioning INCOMING OPERATOR: None SHIFT SUMMARY: Last shift of O2! No issues until Beckhoff SDF died during Adam's detchar safety injections. Jonathan has restarted h1build and it is currently running a file system check. Intention bit set to commissioning. Observatory mode set to commissioning. IFO at NLN. LOG: 16:02 UTC Powercycled video2. MEDM screen updates were intermittent. 16:07 UTC Restarted the range integrand DMT that is displayed on video0. It had been running locally on video0 instead of through ssh on nuc6. 17:23 UTC Gave Adam M. remote access to cdsssh and h1hwinj1. 18:50 UTC GRB verbal alarm. Confirmed with LLO. 15:00 UTC End of O2! Set observatory mode to calibration. Changed INJ_TRANS guardian node to INJECT_SUCCESS. 22:43 UTC Adam M. starting detchar safety injections. Set intent bit to commissioning. HFD to mid X to check on RFAIR box. ~23:09 UTC Beckhoff SDF died. IFO_LOCK guardian node went into error (lost connection to SDF channels). Adam's injections interrupted. Jonathan investigating. 23:23 UTC Jonathan restarted h1build and it is running a file system check. Adam canceling remainder of injections. Transitioned observatory mode to commissioning.