SQZ cable installation for 8/29/2017:
1. Heliax cables were pulled/dressed into racks ISC-C3 & ISC-C4.
2. 4 DC power cables were pulled in from the CER Mezzanine to HAM6 racks.
Further work to be done:
1. Terminate DC and RF cabling
2. Install patch panels in racks.
3. SQZ-R1 rack is missing top lid. Still need to connect DC power junction box and DC power strips.
F. Clara, E. Merilh, R. McCarthy