DAY Operator Summary

TITLE: 08/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:

Gate Valve for EX has been closed all day today for TMDS work.  This allowed for active work on the floor throughout the site.  The plan is to open EX gate valve in the morning, measure charge, and then try to locking H1 in the afternoon.  In parallel staging for TMDS at EY may happen tomorrow.
LOG: