TITLE: 08/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 6mph Gusts, 4mph 5min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.16 μm/s
QUICK SUMMARY:
Kyle & Bubba are prepping for GV20 opening at EX (after work permit signed) this morning.
As of last night the game plan for the morning was also to have charge measurements run for ETMx and then start locking late morning/afternoon.
IFO Status: