Reports until 17:42, Saturday 02 September 2017
H1 General
sheila.dwyer@LIGO.ORG - posted 17:42, Saturday 02 September 2017 (38497)
some locking today.

Today I ran some charge measurements and worked on the script for analyzing and plotting.  My script for transitioning DARM control to ETMX in low noise had a bug which caused a lockloss, after this I grounded the ETMY ESD cables and tried to relock but spent ~40 minutes on violin modes.  While I was damping violins we got a 5.3 in Idaho which tripped several ISIs, everything is re-isolated now but I'm leaving the SEI state as Large EQ. The next person to try locking should be careful about violins.  

ETMY ESD is re-connected for now, I hope to do the grounding test tomorow.