TITLE: 09/05 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ed
SHIFT SUMMARY:
LOG:
15:01 Turned off Sensor Correction (BRS) at both ends
15:01 Verified Pico motors at EY off. This should reamin the case for the next two days
15:02 Kyle out to EY to begin discharge procedure. Thids task will take all day.
15:17 Karen to EY to clean.
15:20 Chris taking the pest control person into the LVEA and then down the arms
15:27 Port-a-potty service on site
15:30 Christina to EX for cleaning
15:48 re-booted Video2 and 4. Updated Observatory mode to Preventative Maintenance
15:49 Jeff B into LVEA to identfy network cables for Dust Monitors
15:45 Patrick out to LVEA to execute WP#7137
16:05 Corey out to LVEA
16:14 Cintas on site
16:16 Richard and Ken out to the floor
16:21 LN2 headed to dewar 76 (X CS)
16:25 Richard, Patrick and Ken out
16:28 Soike out to LVEA
16:31 Corey craning internal to squeezer bay.
16:32 Ken back into the LVEA
16:56 Jason out to TCS spares cabinet in LVEA
17:00 Jason out
17:08 Hugh into LVEA
17:10 Kyle called and said he was prepping to close GV at EY.
17:19 Hugh out
17:19 Second EY 300u dust alarm of the day
17:29 FIl out to the floor to document cables for table disconnects
17:31 Jim out to floor to check abou moving te BRS
17:31 Richard out to the floor
17:36 Pest Control checking out for the day.
17:46 Patrick and Dave to End stations to try and re-program the GPS WP#7136
17:46 Elizabeth out to the floor to pick up seismometers
18:36 Dave and Patrick as well as Soike are all back. Chris is going into the LVEA.
18:59 Dave and Patrick back at EX
19:40 Brian with Apollo through the gate.
20:27 Fil out to CER and associated Mezzanine
20:29 Patrick and Dave to EY.
21:30 resarting nuc5
21:45 HFD on site responding o an alarm that was triggered by Bubba at MY.
21:52 Dave and Patrick back
22:18 Jason out to TCS table to grab a power meter for Travis.