TITLE: 09/06 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Commissioning INCOMING OPERATOR: None SHIFT SUMMARY: TMDS at end Y done. GV opened. Charge measurements run but not complete. Ran through initial alignment. Had to skip initial alignment of Y arm, something kept pushing the lock off. Sheila destroyed a guardian node that was interfering with locking ALS DIFF. Back to NLN at ~56 MPc. LOG: 14:40 UTC Peter working in back of optics lab 14:41 UTC Restarted video0 15:04 UTC Set observatory mode from maintenance to commisioning Jim running excitation on HAM4 15:49 UTC TJ to optics lab to retrieve item 16:53 UTC Kyle opening GV 17:03 UTC Peter done 17:22 UTC Richard to end Y to turn on high voltage for ESD and ring heater 17:44 UTC Richard done 19:45 UTC Starting locking 19:46 UTC Peter to optics lab 20:33 UTC Kyle to LVEA 20:51 UTC Kyle back 21:05 UTC Peter done 21:28 UTC Kyle to end Y to check on pump (adjacent room to VEA) 22:01 UTC Kyle back 23:44 UTC NLN ~56 MPc