Displaying report 1-1 of 1.
Reports until 22:44, Thursday 07 September 2017
H1 PSL (PSL)
thomas.vo@LIGO.ORG - posted 22:44, Thursday 07 September 2017 - last comment - 05:06, Friday 08 September 2017(38569)
PSL Ref Cav Needs Adjustment

Attached is a  trend of the PSL status in the past 60 days, it seems like the FSS_TPD is slowly diminishing over time and needs to be looked at.  We think this is the reason why we had trouble locking in aLOG-38568 and the reason why we had to increase the FSS gain by +6dB.

Images attached to this report
Comments related to this report
peter.king@LIGO.ORG - 05:06, Friday 08 September 2017 (38571)
The ALS requirement for power going into the fibre after the reference cavity is 10 mW.
Fortuitously 10 mW corresponds to 1 V for the reference cavity transmission.  I do not
know how forgiving the ALS power requirement is but the reduced reference cavity transmission
might have something to do with locking in green.

    Increasing the servo gain by 6 dB probably means that the unity gain of the FSS had
dropped to a point where it may have presented problems for the IMC.