(Apollo [Mark, Tyler], Corey, Daniel, Fil, Keita, Patrick)
This morning IOT2R (small table), IOT2L, & ISCT6 were prepped for being moved. Prep work included:
- Disconnecting all electrical cables from tables (Photo #1 shows Patch Panels with cables removed. Thank you, Fil!)
- Marking the position & elevation for IOT2L & ISCT6 (IOT2R is moving from HAM2 to HAM6 & will become SQZT6 (see D1500297))
- Disconnecting bellows from chamber, covering viewports, & covering open holes on tables (See Photo #2--Patrick did most of this for all three tables, Thanks!)
- Removing any loose items on the tables or on top of their enclosures.
- Many thanks to Mark & Tyler for handling bulk of the craning work (Photo#3 shows craning of IOT2R into Squeezer Bay)
Notes For IOT2L:
- Three corners marked with plumb bob +/- 1mm & marked as "Sept 12, 2017"
- Measured elevation of 3 15/16" - 4 " (floor up to --> bottom surface of horizontal boxbeams)
- This was rolled from HAM2, to a space adjacent to the IMC Tube closer to HAM3. It was fairly easy for two people to roll it as long as the wheels are lined up.
Notes For IOT2R: (smaller table)
- Did not mark position since it is moving to south side of HAM6
- This was rolled from HAM2 to near the Squeezer Bay and then craned into the Squeezer Bay.
Notes For ISCT6:
- Three corners marked with plumb bob +/- 1mm & marked as "Sept 12, 2017"
- Measured elevation of 3.5" (floor up to --> bottom surface of horizontal boxbeams)
- This was craned into the Squeezer Bay.