TITLE: 09/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Commissioning LOG: Jeff B. in PSL enclosure working on H2O manifold 14:41 UTC Visitor through gate for safety audit 14:43 UTC Karen to warehouse Richard working by HAM6 15:08 UTC Richard back 15:29 UTC Richard and Filiberto to HAM6 15:33 UTC John showing visitors from India around 15:53 UTC Chandra to LVEA 15:54 UTC Ed to CER to help Filiberto terminate cables 15:58 UTC Visitor through gate to see Chandra 16:21 UTC Christina starting cleaning of HAM2 16:23 UTC Hugh to LVEA to lock HEPIs 16:26 UTC Jason to PSL 16:39 UTC ISI HAM2 WD tripped. Cleaning chamber. 16:57 UTC Contractor through gate to do insulation work for Bubba 17:04 UTC Ed to PSL to help Jason with alignment h1nds crashed, kernal panic, Carlos restarted 17:20 UTC Contractor through gate to do insulation work for Bubba 17:36 UTC Travis to LVEA to look for tooling 17:39 UTC Richard to LVEA with Albert L. and Tim N. 17:43 UTC Travis back 17:49 UTC Richard back 17:52 UTC Richard to LVEA to see Filiberto 18:01 UTC Richard back 18:48 UTC Visitor through gate to see Marc P. 18:57 UTC Hugh back 19:49 UTC Betsy to LVEA 20:00 UTC All hands safety meeting 20:15 UTC Visitor through gate to see Betsy 21:35 UTC Hugh to LVEA to lock HEPIs 21:43 UTC Richard to LVEA, CER 21:45 UTC Ed and Jason back to PSL 22:12 UTC Marc to CER 22:16 UTC Marc back 22:59 UTC Hugh back 23:07 UTC Ed back, Jason still in PSL enclosure