Reports until 08:08, Friday 15 September 2017
H1 General
edmond.merilh@LIGO.ORG - posted 08:08, Friday 15 September 2017 - last comment - 08:42, Friday 15 September 2017(38649)
Shift Transition - Day

TITLE: 09/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 7mph Gusts, 6mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.14 μm/s
QUICK SUMMARY:

 

Comments related to this report
edmond.merilh@LIGO.ORG - 08:27, Friday 15 September 2017 (38650)

Jeff B is in PSL mitigating some more small leaks in the new water manifold.

 

edmond.merilh@LIGO.ORG - 08:42, Friday 15 September 2017 (38652)

15:27 Ken down to MX (outside)

15:34 Cheryl into optics lab

15:41 Fil out to MY

I'm going to go work in PSL. TJ and Cheryl will be covering ops.