TITLE: 09/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 7mph Gusts, 6mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.14 μm/s
QUICK SUMMARY:
Jeff B is in PSL mitigating some more small leaks in the new water manifold.
15:27 Ken down to MX (outside)
15:34 Cheryl into optics lab
15:41 Fil out to MY
I'm going to go work in PSL. TJ and Cheryl will be covering ops.